Lumby WasteWater Treatment Plant Maintenance

Please be advised that, as part of maintenance of the Village of Lumby Wastewater Treatment Facility, Lagoon #1 will be put offline, drained and cleaned.

As a result, residents may detect an abnormally strong odour resulting of the maintenance.

The work is to scheduled to last from April 2 – April 12, 2024. Continued operations of the wastewater system will not be affected.

The Village of Lumby apologizes for any inconvenience that may arise.