Lumby logo

RFP ES-2018-02 Groundwater Supply Evaluation, Wells Construction & Replacement Plan

The Village of Lumby has obtained grant funding through the Clean Water and Wastewater Fund (CWWF) for the 1st phase of a single production well replacement program.  As indicated in the Village’s successful application to the CWWF, the first phase includes a geologic overview to refine the basic aquifer mapping and gain an understanding of the aquifers underlying Lumby.  It also includes installing two new monitoring wells along with identifying 6 existing neighboring wells for installation of sounding tubes and data loggers. Pump tests of existing wells stress the aquifer to help determine the current limits of each well as well provide important hydraulic information to understand the sustainability of current pumping rates and the expected pumping rates of the future replacement wells. After sufficient amount of time for data collection and monitoring reports will be prepared on the assessment of the aquifer and a plan for replacement of the existing water well #3. 

To view RFP ES-2018-02, click here.

To view the Resources Provided, click below:

1. Village of Lumby (AE, Groundwater Supply Development - Feb 2003);

2. Village of Lumby (Golder, Groundwater Exploration and Aquifer Evaluation - Feb 2003);

3. Village of Lumby (Well Locations);

4. Village of Lumby (Golder, AE - Screening Level Environmental Assessment for Groundwater Treatment Plant and Supply Backup - Aug 2004);

5. Village of Lumby (Golder, Initial Phase in the Development of a Groundwater Mngt Plan - July 2007);

6. Village of Lumby (BC Ground Water, Geologic Mapping and Assessment - March 2018);

7.  Village of Lumby (CWWF Application).

 

Friday, May 4, 2018 - 8:45am

1775 Glencaird Street
PO Box 430
Lumby, BC V0E 2G0
250.547.2171

 

Powered by CivicWeb CMS - © Copyright 2012 iCompass Technologies Inc.

flowersmountainpath

Lumby Outdoor Pool

The Villa's